DOW-UAP-D172

BAASS Ten-Month Report, July 2009, page 9

One page of a U.S. government record released under PURSUE, shown on its own with its text. The record page has the whole document, its catalog details and the scan.

Page
9 of 538
Agency
Department of War
Released
Release 08, November 20, 2026

Archive note war.gov's data file does not mark this record as redacted, but the file carries FOIA exemption stamps (for example "(b)(3)") where material was withheld. See all corrections

Text of page 9

This in fannation is proprietag and eannet he disseminated or used- Tithout prior wrine consent tim the Operating Manage of DAAsss. Progress on New BAASS Facilities: May-July 2009 During the month of May 2009 1843(a)(2) the BAASS administrator, made substantial progress on two major real estate projects in line with anticipated future BAASS needs (see below). (1) Underground Vault: The need for a highly secure underground vault operated by BAASS became apparent in line with a BAASS priority to pursue and acquire recovered hardware and biological samples from the corporate world and/or from private individuals and groups located elsewhere, including Brazil. It was recognized by the BAASS administrator that there was no highly secure facility at BAASS to store exotic material or tissue that the organization could obtain. Accordingly, the BAASS administrator designed an underground facility to be located in North Las Vegas at the Bigelow Aerospace facility. The chosen location is exceptionally well protected by perimeter fencing and razor wire, surveillance cameras and 24 hour armed guards who are retired or current military. Further, the BAASS administrator during the month of May designed and created architectural plans for a 5000 sq.ft underground vault with 3 foot thick walls, ceiling and floor with a concrete access tunnel leading to multiple security doors, at least one of which comprises a thick vault steel door. The entire facility will be located underground at the Bigelow Aerospace facility with over 15-20 feet of earth above the structure. Any surface structures protruding from the ground will be extensively camouflaged. It is anticipated that subject to building permits, the new underground facility will be capable of being occupied by late 2009 or early 2010. More details on this project will be reported in the August 2009 BAASS monthly report. (2) New Buildings Purchased for BAASS: Because of the extremely rapid pace of BAASS personnel expansion (see previous section), the Page 3

Machine-read (OCR) from the scan by this archive; it can contain errors. The scan is the record.

Image from page 9 of DOW-UAP-D172, as released by war.gov
Image from page 9 of the PDF. Open the scan to see the whole page.

Cite this page

U.S. Department of War. "BAASS Ten-Month Report, July 2009" (DOW-UAP-D172). PURSUE Release 08, U.S. Department of War, November 20, 2026. https://www.war.gov/medialink/ufo/docs-112026-release-08/DOW-UAP-D172-BAASS_Ten_Month_Report_July-2009.pdf. Declassified UAP, page 9, https://declassifieduap.org/r/dow-uap-d172-baass-ten-month-report-july-2009/p/9. Accessed November 28, 2026.

This address shows page 9 on its own; /r/dow-uap-d172-baass-ten-month-report-july-2009?page=9 opens the same page in the full reader. Both stay. How to cite.