DOW-UAP-D172

BAASS Ten-Month Report, July 2009, page 7

One page of a U.S. government record released under PURSUE, shown on its own with its text. The record page has the whole document, its catalog details and the scan.

Page
7 of 538
Agency
Department of War
Released
Release 08, November 20, 2026

Archive note war.gov's data file does not mark this record as redacted, but the file carries FOIA exemption stamps (for example "(b)(3)") where material was withheld. See all corrections

Text of page 7

This.information. is.proprietary.and eannet he disseminated or tried #ithout prior writet censent fent the Operating Manager or Brass D.- SECTION 1: CREATION OF BAASS ORGANIZATION AND INFRASTRUCTURE (1) Creation of BAASS Organization and Infrastructure September 22, 2008- July 31, 2009. BAASS received notification that contract # HHM402-08-C-0072 was awarded on September 22, 2008. The contract stipulated that BAASS would acquire buildings and ensure that they conformed to regulations concerning the Top Secret security clearances needed to operate AND that the necessary qualified personnel would be hired that would be capable of researching advanced aerospace technology under the rubric of the following 12 designated areas: (1) Lift, (2) Propulsion, (3) control, (4) Power Generation, (5) Spatial/Temporal Translation, (6) Materials, (7) Configuration/Structure, (8) Signature Reduction (Optical/IR/RF/Acoustic), (9)Human Interface, (10) Human effects, (11) Armament (RF and DEW), and (12) Other areas in support of 1-11. 1843(a)(2) the BAASS administrator summarized the initial problems associated with correctly choosing the first BAASS facility in the October 2008 monthly report: "I personally spent considerable time checking out numerous possible locations for BAASS, keeping in mind that, certain criteria needed to be met. In addition to this criteria, there were issues of physical modifications that were necessary for all locations. Issues including: who would pay for these changes; the reluctance of landlords to agree (sometimes we could not locate a spokesperson responsible for the landlord) to these modifications; and the glacial pace that this entire remodeling process would take. All choices required some remodeling and the landlords were not very accommodating. Finally, I chose one of my own buildings. BAASS would not have a landlord standing over it, dictating every remodeling move or preventing some important change. Also, very Page 1

Machine-read (OCR) from the scan by this archive; it can contain errors. The scan is the record.

Image from page 7 of DOW-UAP-D172, as released by war.gov
Image from page 7 of the PDF. Open the scan to see the whole page.

Cite this page

U.S. Department of War. "BAASS Ten-Month Report, July 2009" (DOW-UAP-D172). PURSUE Release 08, U.S. Department of War, November 20, 2026. https://www.war.gov/medialink/ufo/docs-112026-release-08/DOW-UAP-D172-BAASS_Ten_Month_Report_July-2009.pdf. Declassified UAP, page 7, https://declassifieduap.org/r/dow-uap-d172-baass-ten-month-report-july-2009/p/7. Accessed November 28, 2026.

This address shows page 7 on its own; /r/dow-uap-d172-baass-ten-month-report-july-2009?page=7 opens the same page in the full reader. Both stay. How to cite.