DOW-UAP-D048

Department of the Air Force Report, 1996, page 86

One page of a U.S. government record released under PURSUE, shown on its own with its text. The record page has the whole document, its catalog details and the scan.

Page
86 of 181
Agency
Department of War
Released
Release 01, May 8, 2026

Text of page 86

Traditionally, a value of B = 1,000 has been used by the 45 SW/SE in ship-hit calculations, and by RTI in performing launch-area risk analyses for the 45 SW/SE. Using this value of B, for each vehicle values of A were found that produced a good match between simulated and theoretical data. The results for qa = 5,000, 10,000, and 20,000 deg-lb/ft are given in Table 31. As discussed earlier in the report, no single value of A could be found that produced a good fit over the entire 180° sector, although with one exception a good match did exist in the uprange portion of the sector from about $90° to $180°. For launches from Cape Canaveral, most population centers are located in this uprange sector. For any launch-area population centers located in the downrange sector, the risks are almost surely dominated by the Mode-4 failure response. Vehicle Atlas IIAS Delta-GEM Titan IV LLV1 Other vehicles Table 31. Summary of A Values for B = 1,000 Flight Breakup ga (deg-lb /ft*) Phase 0 - 2 0-1 0-1 0-2 --- (sec) 280 270 300 290 --- 5,000 10,000 20,000 3.45 3.20 2.75 4.30 3.10 2.90 3.50 2.75 3.25 2.95 3.5 2.70 2.60 3.1 2.8 Other values of B were investigated to find combinations of B and A that provided the best possible data fits over the largest possible portion of the 0° to 180° sector. Although no combinations of A and B could be found that produced good fits for the entire 180° sector, the values shown in Table 32 extended the fit from the uprange direction to within about 40° of the downrange direction. Table 32. Summary of Optimum Mode-5 Shaping Constants Flight Breakup qa Vehicle Atlas Delta Titan LLV1 Phase 0-2 0 - 1 0-1 0-2 (sec) 280 270 300 290 (deg-lb/ft*) 5,000 5,000 5,000 5,000 5,000,000 4 1,000 1,000 A 6.30 3.50 3.50 2.75 Launch-area risk calculations were made for Atlas and Delta to ascertain the effects of using radically different values of A and B in the Mode-5 impact-density function. For example, for a breakup ga of 5,000 deg-b/ft, values of A = 3.45 and B = 1,000 from Table 31 and A = 6.30 and B = 5,000,000 from Table 32 were used to determine total Mode-5 launch-area risks for an Atlas IIAS launch from Complex 36. The total risks differed by about 10%. (Other results for Atlas IIAS are given in Table 21, and for Delta in Table 23.) Other calculations for Atlas and Delta show that the value of B is not 9/10/96 77 RTI

Machine-read (OCR) from the scan by this archive; it can contain errors. The scan is the record.

Cite this page

U.S. Department of War. "Department of the Air Force Report, 1996" (DOW-UAP-D048). PURSUE Release 01, U.S. Department of War, May 8, 2026. https://www.war.gov/medialink/ufo/release_1/dow-uap-d48-report-september-1996.pdf. Declassified UAP, page 86, https://declassifieduap.org/r/dow-uap-d048-department-of-the-air-force-report-1996/p/86. Accessed November 28, 2026.

This address shows page 86 on its own; /r/dow-uap-d048-department-of-the-air-force-report-1996?page=86 opens the same page in the full reader. Both stay. How to cite.