DOW-UAP-D048

Department of the Air Force Report, 1996, page 167

One page of a U.S. government record released under PURSUE, shown on its own with its text. The record page has the whole document, its catalog details and the scan.

Page
167 of 181
Agency
Department of War
Released
Release 01, May 8, 2026

Text of page 167

28. J-9,20 Dec 60, Response Mode 4, Flight Phase 2: No Stage-Il ignition due to failure of gas generator to start. 29. J-10, 20 Jan 61, Response Mode 4, Flight Phase 2: No Stage-Il operation due to erroneous signal that appeared at umbilical disconnect. Impact some 420 miles downrange. 32. J-12, 3 Mar 61, Response Mode 4, Flight Phase 2: Stage-II terminated prematurely after 54-second burn, apparently due to failure of pump drive assembly. Impact was 730 miles downrange. 34. J-15, 31 Mar 61, Response Mode 4, Flight Phase 1: Booster shut down prematurely at 74 seconds. Missile subsequently tumbled and broke up. 37. M-1, 24 Jun 61, Response Mode 4T, Flight Phase 2: Stage II engine shut down prematurely after 12 seconds of operation due to loss of Stage II hydraulic power. Loss of hydraulic power occurred during Stage I flight, so failure led to loss of control of sustainer and vernier actuators, producing excessive missile motion and tumbling. 42. M-3,7 Sep 61, Response Mode 5, Flight Phase 2: A transient in guidance computer at 218.35 seconds (SECO at 297.7 seconds) caused impact 20 miles short and 2.8 miles left of target. 45. M-4, 6 Oct 61, Response Mode 5, Flight Phase 2: A one-bit error in the W velocity accumulation caused impact 86 miles short and 14 miles right of target. 50. M-6, 15 Dec 61, Response Mode 4, Flight Phase 2: Start signal for Stage II was not generated. Stage II did not ignite. 51. I, 20 Jan 62, Response Mode 4, Flight Phase 2: Missile self-destructed, apparently after Stage 2 failed to ignite. A backup automatic fuel-cutoff signal was sent at 248 Seconds. 53. 1, 23 Feb 62, Response Mode 4, Flight Phase 2: Missile self-destructed, apparently after Stage 2 failed to ignite. A backup automatic fuel cutoff signal was sent at 240 Seconds. 56. N-1, 7 Jun 62, Response Mode 4, Flight Phase 2: Sustainer engine performance was subnormal due to reduced oxidizer flow through the gas generator. RSO terminated flight after a prolonged sustainer burn. Impact only 1100 miles downrange. 58. N-4, 25 July 62, Response Mode 4, Flight Phase 2: After about 60 seconds of Stage Il burn, a fuel leak between the thrust chamber valve and the injector resulted in a 9/10/96 158 RTI

Machine-read (OCR) from the scan by this archive; it can contain errors. The scan is the record.

Cite this page

U.S. Department of War. "Department of the Air Force Report, 1996" (DOW-UAP-D048). PURSUE Release 01, U.S. Department of War, May 8, 2026. https://www.war.gov/medialink/ufo/release_1/dow-uap-d48-report-september-1996.pdf. Declassified UAP, page 167, https://declassifieduap.org/r/dow-uap-d048-department-of-the-air-force-report-1996/p/167. Accessed November 28, 2026.

This address shows page 167 on its own; /r/dow-uap-d048-department-of-the-air-force-report-1996?page=167 opens the same page in the full reader. Both stay. How to cite.