DOW-UAP-D048

Department of the Air Force Report, 1996, page 153

One page of a U.S. government record released under PURSUE, shown on its own with its text. The record page has the whole document, its catalog details and the scan.

Page
153 of 181
Agency
Department of War
Released
Release 01, May 8, 2026

Text of page 153

96. ITOS-E (WTR), 16 July 73, Response Mode 4T, Flight Phase 2: Pump-motor failure during second-stage burn at 490 seconds resulted in loss of hydraulic pressure, loss of attitude control, and vehicle tumbling. 100. Skynet IIA, 19 Jan 74, Response Mode NA, Flight Phase 4 and 5: Flight was within normal limits until impact point passed through Africa gate. During the second burn of the second stage, a short circuit in the second-stage electronics package resulted in an improper spacecraft orbit. The satellite reentered the earth's atmosphere five days later on 24 Jan 74. 101. WESTAR-B, 13 Apr 74, Response Mode NA, Flight Phase 1: One solid-rocket motor carried to MECO, but mission was still a complete success. 102. SMS-A, 17 May 74, Response Mode NA, Flight Phase 1 and 5: Mission was a partial success, although low first-stage velocity resulted from a liquid oxygen pressure line failure, and a booster shroud that snagged before fully jettisoning Apogee was some 1,767 miles below the planned value, and well outside three- sigma limits. 130. ESRO-GOES, 20 Apr 77, Response Mode NA, Flight Phase 2.5 and 5: Due possibly to a short circuit in the second stage or failure in one of the two explosive bolts that hold the stage 2/3 clamp band together, the third stage separated normately fros, the sea resta, coile surin atonly te bum rested of the spacecraft apogee nearly 13,000 miles low, and far outside three-sigma limits. 134. OTS, 13 Sep 77, Response Mode 4, Flight Phase 1: Core vehicle exploded at 57 seconds due to a burn through on the forward end of the #1 Castor IV motor. 155. DE, 3 Aug 81, Response Mode NA, Flight Phase 2 and 5: Flight was considered a success, although a 260-pound deficiency in fuel loading led to a premature propellant-depletion shutdown of the second burn of the second stage and degradation of final orbit. The inertial velocity at SECO was 240 ft/sec lower than planned. Final apogee was some 855 miles too low and well outside three-sigma limits. 162. WESTAR-V, 9 June 82, Response Mode NA, Flight Phase 1: Booster performance was low but mission was a success. Apogee and perigee were within three-sigma limits. 178. GOES-G, 3 May 86, Response Mode 4, Flight Phase 1: An electrical short in a ontrol circuit in first-stage relay box caused premature main-engine shutdown 1 seconds. Vehicle then tumbled and was broken up by aerodvnamic force RSO sent destruct at approximately 91 seconds. 9/10/96 144 RTI

Machine-read (OCR) from the scan by this archive; it can contain errors. The scan is the record.

Cite this page

U.S. Department of War. "Department of the Air Force Report, 1996" (DOW-UAP-D048). PURSUE Release 01, U.S. Department of War, May 8, 2026. https://www.war.gov/medialink/ufo/release_1/dow-uap-d48-report-september-1996.pdf. Declassified UAP, page 153, https://declassifieduap.org/r/dow-uap-d048-department-of-the-air-force-report-1996/p/153. Accessed November 28, 2026.

This address shows page 153 on its own; /r/dow-uap-d048-department-of-the-air-force-report-1996?page=153 opens the same page in the full reader. Both stay. How to cite.