DOW-UAP-D048

Department of the Air Force Report, 1996, page 132

One page of a U.S. government record released under PURSUE, shown on its own with its text. The record page has the whole document, its catalog details and the scan.

Page
132 of 181
Agency
Department of War
Released
Release 01, May 8, 2026

Text of page 132

131. LV-3A/Agena B (Rubber Gun), 17 June 62, Response Mode 4, Flight Phase 3: Although Atlas performance was satisfactory, the mission was apparently a failure. No other data available. 134. 67E (Extra Bonus), 13 July 62, Response Mode 4, Flight Phase 2 and 2.5: A LOX leak in the high-pressure line apparently froze sustainer control components. Residual sustainer thrust after cutoff continued for some 30 seconds, causing a 120-mile overshoot. 137. 145D (Mariner R-1), 22 July 62, Response Mode 5, Flight Phase 2: Booster stage and flight appeared normal until after booster staging at guidance enable at about 157 seconds. Operation of guidance rate beacon was intermittent. Due to this and faulty guidance equations, erroneous guidance commands were given based on invalid rate data. Vehicle deviations became evident at 172 seconds and continued throughout flight with a maximum yaw deviation of 60° and pitch deviation of 28° occurring at 270 seconds. The vehicle deviated grossly from the planned trajectory in azimuth and velocity, and executed abnormal maneuvers in pitch and yaw. The missile was destroyed by the RSO at 293.5 seconds, some 12 seconds after SECO. 141. 87D (Peg Board II), 9 Aug 62, Response Mode 4, Flight Phase 2.5: Failure of the sustainer/vernier hydraulic system to maintain system pressure prevented normal operation during the vernier solo phase. 142. 57F (Crash Truck), 10 Aug 62, Response Mode 5, Flight Phase 1: The roll program failed. The missile was destroyed by the RSO at 68 seconds. 144. 179D (Mariner R-2), 27 Aug 62, Response Mode NA, Flight Phase 2: Flight was successful although roll control was lost during the period from 140 seconds to 190 seconds due to erratic performance of vernier engine #2. Before and after this time interval, vernier #2 and all other Atlas and Agena systems performed normally. 146. 4D (Briar Street), 2 Oct 62, Response Mode 4, Flight Phase 2: The missile self- destructed at 183 seconds. The vernier engines shut down prematurely at 46 seconds. Subsequently, closure of the vernier bleed valves led to excessively high sustainer performance and premature shutdown at 181.3 seconds. 148. 215 D (Ranger-5), 18 Oct 62, Response Mode NA, Flight Phase 5: Flight was regarded as successful although failure in the ground control system 35 minutes after launch prevented accomplishment of primary lunar impact and study mission. The guidance rate beacon failed at 94.6 seconds but backup differentiated tracking data kept the vehicle within normal limits. 153. 13F (Action Time), 14 Nov 62, Response Mode 4, Flight Phase 1: The flight was terminated when sustainer and vernier engines shut down prematurely at 9/10/96 123 RTI

Machine-read (OCR) from the scan by this archive; it can contain errors. The scan is the record.

Cite this page

U.S. Department of War. "Department of the Air Force Report, 1996" (DOW-UAP-D048). PURSUE Release 01, U.S. Department of War, May 8, 2026. https://www.war.gov/medialink/ufo/release_1/dow-uap-d48-report-september-1996.pdf. Declassified UAP, page 132, https://declassifieduap.org/r/dow-uap-d048-department-of-the-air-force-report-1996/p/132. Accessed November 28, 2026.

This address shows page 132 on its own; /r/dow-uap-d048-department-of-the-air-force-report-1996?page=132 opens the same page in the full reader. Both stay. How to cite.