CIA-UAP-003

The Central Intelligence Agency and Overhead Reconnaissance; The U-2 and OXCART Programs, 1954-1974, page 354

One page of a U.S. government record released under PURSUE, shown on its own with its text. The record page has the whole document, its catalog details and the scan.

Page
354 of 406
Agency
CIA
Released
Release 03, June 12, 2026

Text of page 354

- Secret NOFORN Appendix E 341 or more of the aircraft was always being repaired, and eventually three of the five AQUILINE prototypes were destroyed in testing. Although AQUILINE's visual and accoustic signatures were very small, its radar cross section continued to cause problems. The radar cross section at low frequencies was less than one-tenth of a square meter, giving it a radar signature smaller than that of an eagle, but there were flares in the VHF region that increased the likelihood of detection. Studies indicated that the radar cross section problems could eventually be reduced to acceptable levels, but the greatest weakness of the AQUILINE project was its navigational system. AQUILINE did not have a programmable autopilot; it had to be flown by remote control from the ground. Once the aircraft flew over the horizon, all navigational commands had to be relayed to it by high-flying aircraft. A DC-6 loitering at 25,000 feet would give AQUILINE a range of 250 nautical miles: use of a U-2 at 70,000 feet could increase this to 350 nautical miles. - -Such a range was suitable for the targets originally conceived for AQUILINE, but the need for intelligence on targets located much deeper in the Soviet Union and the People's Republic of China and the development time and costs for AQUILINE began to soar. By 1971 ORD had spent six years and $33 million on AQUILINE but still had many important problems to re- solve. At this point the project was turned over to the Office of Special Activities for operational testing at Area 51 in Nevada. Flight tests showed the aircraft to be successful by the standards originally set for the project in 1967, as it flew 130 miles and obtained very high reso- lution photography of a target before returning successfully to the original launchsite. However, improving AQUILINE sufficiently to make it a practical long-range reconnaissance system was estimated to cost another $35 million and take two to three years. On the recom- mendation of DDS&T Carl Duckett on | November 1971, Project AQUILINE was canceled. The project's aircraft and equipment were eventually transferred to the US Army for use in a battlefield manage- ment system known as AQUILA, which has yet to be deployed be- cause of continuing developmental problems. -Secret wen.

Machine-read (OCR) from the scan by this archive; it can contain errors. The scan is the record.

Cite this page

Central Intelligence Agency. "The Central Intelligence Agency and Overhead Reconnaissance; The U-2 and OXCART Programs, 1954-1974" (CIA-UAP-003). PURSUE Release 03, U.S. Department of War, June 12, 2026. https://www.war.gov/medialink/ufo/061226/release_03/documents/CIA-UAP-003-THE_CENTRAL_INTELLIGENCE_AGENCY_AND_OVERHEAD_RECONNAISSANCE-THE_U-2_AND_OXCART_PROGRAMS_1954-1974.pdf. Declassified UAP, page 354, https://declassifieduap.org/r/cia-uap-003-the-central-intelligence-agency-and-overhead-reconnaissance-the-u-2-and-oxcart-programs-1954-1974/p/354. Accessed November 28, 2026.

This address shows page 354 on its own; /r/cia-uap-003-the-central-intelligence-agency-and-overhead-reconnaissance-the-u-2-and-oxcart-programs-1954-1974?page=354 opens the same page in the full reader. Both stay. How to cite.