CIA-UAP-003

The Central Intelligence Agency and Overhead Reconnaissance; The U-2 and OXCART Programs, 1954-1974, page 299

One page of a U.S. government record released under PURSUE, shown on its own with its text. The record page has the whole document, its catalog details and the scan.

Page
299 of 406
Agency
CIA
Released
Release 03, June 12, 2026

Text of page 299

-Secret NOFORN Chapter 6 286 DELIVERY OF THE FIRST OXCART The first A-12, known as article 121, was assembled and tested at Burbank during January and February 1962. Since it could not be flown to the Nevada site, the aircraft had to be partially disassembled nd put on a specially designed trailer that cost nearly $100.000 Th ntire fuselage, without the wings, was crated and covered, creating load 35 feet wide and 105 feet long. To transport this huge load safely over the hundreds of miles to the site. obstructing road signs were re- moved, trees were trimmed, and some roadbanks had to be leveled. The plane left Burbank on 26 February 1962 and arrived at Area 51 two days later. After the fuselage arrived in Nevada, its wings were attached and the J/s engines were installed, but the aircraft was still not ready to be rested. This new delay was caused by leaking fuel tanks, a problem that would never be solved completely. Because the A-12's high speeds heat the titanium airframe to more than 500°F, Lockheed designers had to make allowances for expansion. When the metal was cold, the expansion joints were at their widest. In the fuel tanks, these gaps were filled by pliable sealants. but the fuel for the A-12's engines acted as a strong reducing agent that softened the sealants, causing leaks. Thus, when fuel was first poured into the aircraft, 68 leaks developed. Lockheed technicians then stripped and replaced all the ealant, a tedious and time consuming procedure because the sealan equired four curing ecles, each at a different temperature over : period of 30 to 54 hours. The engineers were never able to discover a sealant compound that was completely impervious to the jet fuel while remaining elastic enough to expand and contract sufficiently. The A-12's tanks continued to leak, so when it was fueled, it only received enough fuel to get airborne. The plane would then rendezvous with a tanker, top off its tanks, and immediately climb to operating altitude. causing the metal to expand and the leaks to stop." CHANGES IN THE PROJECT MANAGEMENT Richard Bissell, whose concern for the viability of the U-2 in 1956 had led to the establishment of Project OXCART and who had di- rected its growth all along, was no longer in charge when the first "OSA Histon: chap. 20, p. 62 (TS Codeword): Winnich. "OXCART Story." p. 11 (S). Secret

Machine-read (OCR) from the scan by this archive; it can contain errors. The scan is the record.

Cite this page

Central Intelligence Agency. "The Central Intelligence Agency and Overhead Reconnaissance; The U-2 and OXCART Programs, 1954-1974" (CIA-UAP-003). PURSUE Release 03, U.S. Department of War, June 12, 2026. https://www.war.gov/medialink/ufo/061226/release_03/documents/CIA-UAP-003-THE_CENTRAL_INTELLIGENCE_AGENCY_AND_OVERHEAD_RECONNAISSANCE-THE_U-2_AND_OXCART_PROGRAMS_1954-1974.pdf. Declassified UAP, page 299, https://declassifieduap.org/r/cia-uap-003-the-central-intelligence-agency-and-overhead-reconnaissance-the-u-2-and-oxcart-programs-1954-1974/p/299. Accessed November 28, 2026.

This address shows page 299 on its own; /r/cia-uap-003-the-central-intelligence-agency-and-overhead-reconnaissance-the-u-2-and-oxcart-programs-1954-1974?page=299 opens the same page in the full reader. Both stay. How to cite.